Integrated ceiling Yuba installation steps Recommended ceiling Yuba should pay attention to what points when installing

Yuba believes that everyone is not unfamiliar to it, there are many types of market Yuba, different Yuba installation method is also a certain difference, so it is necessary to understand its method before installation. The following Xiao Bian will introduce to you the integrated ceiling Yuba installation steps recommended and integrated ceiling Yuba installation to pay attention to what points.

Integrated ceiling Yuba installation method recommended

1, the installation of the corner line, the installation of the ceiling must be in the paste after a good tile, but also to maintain the level of the case, so that the integrated ceiling supporting the corner line installed in the above, this purpose is to install the effect can be done There is no obvious gap.

2, in the choice of the lower boom and the installation of light steel keel, the distance between the boom, keel, it must be consistent in the small.

3, the top of the line, this step must first determine which place to install the lamps, but also to understand clearly where to install kitchen and toilet appliances, so that the line can be a good layout.

4, buckle panel, relatively speaking, this installation link it is also a direct impact on the overall installation results, so when the installation must be done to make the formation, but also to do a straight seam Caixing.

5, can consider installing a (embedded) electrical appliances, but also to make the interface between the panel and electrical no gaps.

What should be paid attention to when installing the integrated ceiling Yuba

1, power wiring to regulate

Yuba's power is relatively high, it's up to more than 1100W, therefore, when installing the power of Yuba to take this into account, at the same time to know that the bathroom is a relatively humid place, to choose the waterproof line, the best this It is recommended to choose multi-filament copper core wire of not less than 1mm. All power wiring must be embedded in the wall with a plastic tube. This is safe to use, and its switch must be qualified for waterproof capacity above 10A. Products, so as to ensure its safety performance.

2, should be installed in the center of the bathroom

Many families will consider installing in the shower or bath position when installing Yuba. This installation method has many potential safety hazards on the surface. To know that this kind of electrical product is based on infrared radiation lamp heating up quickly, if installed too close it will burn the human body. So the correct installation method is to install it in the center of the top of the bathroom or slightly close to the bathtub, so that is the most reasonable position.

3, do not spray with water when working

In the use of also note that we know that although the bathroom heater is waterproof, but you know it can not be splashed with water, or easy to cause the risk of power short circuit.

4, keep the bathroom clean and dry

After the bath is completed, I suggest that you do not immediately turn off the bathroom fighter, the best is to do in the bathroom after draining off the more appropriate, while also maintaining indoor ventilation, clean and dry, the only way to extend the life of the Yuba.

Summary: About the integrated ceiling Yuba installation steps Recommended and integrated ceiling Yuba installation should pay attention to what the relevant content is introduced to this, Yuba installation will not be difficult, but it must be installed in a reasonable position Caixing This can play a corresponding role.

Dimethyl Malonate is a common organic reagents, dimethyl malonate is an important raw material for the production of pharmaceutical pipemidic acid. Foreign dimethyl malonate is mainly used as non-ethoxymethylene process production of pipaic acid raw materials, and orthoformate and urea reaction production of pipemidic acid

Monopotassium Phosphate in the application of detection and production applications play an important role


Others

Organic Intermediate,Inorganic Salt,Dimethyl Malonate,Monopotassium Phosphate,Phosphate

SJZ Chenghui chemical co ltd , https://www.chenghuichemicals.com

Posted on