We can see the bathroom with excellent design, and its integrated ceiling Yuba also plays a non-negligible role. If you are going to buy the bathroom integrated ceiling Yuba, you may wish to learn more about it. How can the home improvement have a ceiling? The integrated ceiling is a very important part of the home improvement process, because the integrated ceiling can integrate lighting, heating and decoration. Therefore, when installing, you need extra attention. The following questions about the integrated ceiling Yuba follow the decoration home. Let's take a look at the small series of the net!
the first, Corner installation
The installation strip should be installed flat and firm, determine the installation height, and draw a horizontal line. After the tiles are properly placed, in the horizontal situation, the matching corner lines of the ceiling are integrated and tightly fixed on the tiles, so that there is no obvious gap.
Second, the installation of the keel
The lower boom and the light steel keel are placed, and the distance between the boom and the keel is the same as the panel size. Open the expansion eye at the top and fix all the booms. Connect the lower bottom of the boom to the hook. Then fix the main dragon skeleton in the middle of the hook and adjust the height nut so that the plane of the main keel is 3cm away from the plane line on the edge strip. And fastened.
Third, the installation of the keel
According to the actual installation length minus 5mm, take the required keel, put on the triangular hanging piece, and temporarily suspend all the keel with the triangular hanging piece on the main keel according to the drawings.
Fourth, the installation of the gusset
Wear clean gloves and install the gussets to take into account the overall aesthetics and bilateral symmetry
Cutting method: Fix the template, use the utility knife and ruler to describe it more than three times, cut the edge with a scissors to cut it into a 90 degree angle, and fold it by hand 2-3 times. The corresponding surface of the template cutting opening is stuck in the keel, the cutting surface is placed on the edge strip, and the edge strip is pulled out to clamp the template. At this time, the triangular lifting piece can be clamped with the steel tongs and the main keel. . When the middle part template is installed, the two corresponding faces of the template are respectively stuck in the keel, and the gap between the templates is controlled to maintain the straight line of the seam. Note: After completing the installation of each row of templates, the triangular lifting pieces should be clamped with the steel tongs and the main keel.
Fifth, the installation of the host
When designing the installation position of the heating type host according to the drawing, replace the template with the main panel to confirm the accurate installation position of the main unit; then place the main unit on the top of the keel. Install (embed) the electrical appliance, and make the panel and electrical interface flat and seamless.
Sixth, top trace and port panel
At the top of the line, determine where to install the luminaire, where to install the kitchen and bathroom appliances, and arrange the line in advance. Buckle panel, this link is directly related to the overall effect of the ceiling. Not only should it be leveled, but it should be straight.
Tips: The installation of the integrated ceiling Yuba is not a difficult thing. The key is to buy a suitable product. There are many products and brands in the market that integrate the ceiling Yuba, and it is inevitable to buy. More practical decoration knowledge, construction site and shooting
The above is the whole content of the integrated ceiling Yuba brought by Xiaobian. I believe that after reading this article, the small masters have a basic understanding of the integrated ceiling Yuba. If you want to know more about the decoration consultation, please click to enter the decoration. Process section.
More related wonderful reading:
How to install the bathroom integrated ceiling Yuba?
Integrated ceiling Yuba installation and replacement steps ceiling Yuba purchase tips
How to choose integrated ceiling Yuba top ten brand list
Integrated ceiling Yuba size bathroom Yuba size analysis
Ou Pu integrated ceiling Yuba introduction, Opto integrated ceiling Yuba advantage
Is it better to integrate the ceiling bath? Integrated ceiling Yuba purchase tips
Rain Shower Head with Handheld Shower Faucet Set Complete with High Pressure.Includes one-piece cartridge to simplify installation and maintenance.Our shower system provides free replacement parts in 5 years.
Shower Faucet,Shower Handle,Shower Diverter Valve,Delta Shower
HESHAN CAIZUN SANITRAYWARE CO.,LTD , https://www.nbcaizunsanitaryware.com