Heavy Duty Industrial Caster Wheel

Model NO.: 10 inch
HS Code: 7610900000
                               
   Products Discription data
Material &  Temper  Aluminum Alloy ADC12 ,A380
Surface  Treament Mill-Finished,  Powder Coating,Polishing, Brushing, etc.
Colour Shinning Polishing , powder coated as customer demand
Film  Standard Powder coating: 60-120 μm
Part Weight from 3 g --- 20kgs
   
Application Industry fittings and Construction and Decoration.
   
Casting  Machine   200-1200 tons 
Capability   Output 100 tons per month.
New Moulds   Opening new mould about 30 days .
Fabrication

  Die designing→Die making→Smelting&alloying→QC→Die casting→remove burrs

→QC→Surface treatment→QC→Packing→QC→Shipping→After Sale Service

 Deep  Processing   CNC / Cutting / Punching / Checking / Tapping / Drilling / Milling
   
Certification   1. ISO9001-2008/ISO 9001:2008;
  2. GB/T28001-2001(including all the standard of OHSAS18001:1999);
  3. GB/T24001-2004/ISO 14001:2004;
  4. GMC.
 MOQ As custimer's .  Usually 10-12 tons for a 20'FT; 20-23 tons for a 40HQ.
   
 Free  Samples  YES
 Payment   1. T/T: 30% deposite, the balance will be paid before delivery;
  2. L/C: the balance irrevocable L/C at sight.
 Delivery  time   1. 15 days production ;
  2. If opening mould, plus 10-20 days.
 OEM   Available.

 

Chemical Composition of Aluminum Alloy :

 Alloy Si Fe Cu Mn Mg Zn Ni Sn Al
ADC12 9.6-12.0 0.3-0.6 3.0-3.5 0.3-0.5 0.2-0.3 0.6-0.9 0.2-0.5 <0.3 Al
A380 7.5-9.5 1.3 3.0-4.0 0.5 0.1 3 0.5 0.35 Al

 
Products show
Heavy Duty Industrial Caster Wheel
   Heavy Duty Industrial Caster Wheel


    Manufactury workshop
    

     Heavy Duty Industrial Caster Wheel
   
      Heavy Duty Industrial Caster Wheel

  FAQ

Q1. What is your terms of packing?
A: Generally, we pack our goods in single color box. If you have special request about packing, pls negotiate with us in advance, we can pack the goods as your request.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages 
before you pay the balance. Other payments terms, pls negotiate with us in advance, we can discuss.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.

Q4. How about your delivery time?
A: Generally, it will take 25 to 30 days after receiving your advance payment. The specific delivery time depends 
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and 
the courier cost.We welcome sample order.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?
1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, 
no matter where they come from.

My name card

Heavy Duty Industrial Caster Wheel

Aluminium High Speed Spiral Door

Dongguan HengTaichang Doors Co, Ltd. , https://www.dghtcdoors.com

Posted on