Teach you to understand the decoration company quote

>>> Links: How to Read the Decoration Quotes Form

First, the basic situation of the budget statement A budget should include: project name, unit, quantity, process description, specifications of the use of accessories size, management fees, taxes, etc., these items are indispensable, otherwise it is easy for profiteering to opportunistic Opportunity.


Second, the classification of budget items according to the type of work: plumbers, carpenters, mason, painters and other types of work.


Third, according to the decoration content points: hydropower engineering, ground engineering, wall engineering, ceiling engineering, furniture engineering and so on.


Fourth, the general renovation company quotes are basically divided according to each room's decoration content:
example:
Project Name Unit Quantity Main Material Total Accessories Total Manual Total Remarks Bedroom Ceiling Project: 30*30 Wooden Keel
12MM plaster board
50*50MM plaster line ground project: 50*30 wood keel joist wood floor (Lifeng)
Wall Engineering: Baseboard: Nine Percent Board, Walnut Panel, 1.2*1.2 Black Walnut Line Paint Project: Wall Top Latex Paint (Master)
Baseboard nitro varnishes (twelve degrees)
Total material Total material Total manual Total cost:
management fee:
Taxes:
total:

Fifth, decoration company to do the budget common skills 1, demolition (project name)
When a project was split into several projects, the unit price went down, but the total price went up. Example: Dismantling a wall tile into a wall. Base treatment and affixing a wall tile. Two items. Breaking a latex paint project into a wall. Putty and brush Two latex paint projects separate the triangle valves and metal hoses in the toilet installation project into two projects

2, the unit change to the original should be quoted in terms of square meters of the project to be quoted by meters Example: Door cover general decoration companies are only quoted, but some decoration companies are quoted by meters, such a door cover has become 5 meters The unit price went down and the total price went up.

3, playing on the amount of work Many companies are in the context of engineering volume chapter, in order to obtain higher profits such as: Lacquer paint does not deduct the area of ​​doors and windows openings kitchen, bathroom tiles according to the full shop calculation, and paste only when the eyes Look at the place to see, as the back of the cabinet is not posted.
Some of them are also deliberately miscalculating and over-reporting the amount of work. When they are discovered, they are dealt with by budgetary staff.
Some are deliberately underreporting the amount of work, talking about the contract at a low price, and the project has been done halfway, with previous calculation errors and demanding additional payments.

4, the main material unit price to play tricks without the price of a well-known brand-name products, and use no substitute for the name of the product, so that consumers do not know the price.

5, reported high prices of accessories for the consumer more detailed study of the main material, the price of accessories is not clear, decorating companies in this article such as: latex paint accessories offer 6 yuan / square meter, and the actual price of 2 yuan / square Meters below.

6, the main material and accessories prices are not reported separately to the decoration company to fish in troubled water opportunities such as: the floor 200 yuan / square meter, including accessories, that decoration company may only take 150 yuan / square of products used up, but also the United States Did not count your accessories prices.

7. Repeatedly calculating the door installation has been included in the hinges. Flooring has been counted in the floor nails. Then a project “hardware” is added at the end of the project. It is 3,000 yuan. When the budgetary says what materials it is, the answer is not known. This is a common trick used by small decoration companies in previous years, but now it is used less.

Sixth, how to prevent consumers, 1, carefully check the budget book and drawings. Check whether the materials indicated in the drawings are the same as those in the budget book. If the quantities are the same, the materials and brands are required to be indicated in the remarks column. 3. Calculate the quantity of work carefully to see whether there are overestimates and missing items. Suspect 4, investigate the market, understand the market price of the materials used 5, ask the decoration company to quote according to your method, increase the transparency of the quote 6, find more problems, require the decoration company to re-quote 7, please check with the third party

Learn to see prices Lacquer paint door prices Toilet window Plasterboard Ceiling Decorating Find Decoration Company Okay Flooring Kitchen Wall Tiles Kitchen Doors Kitchen Doors Bathroom Doors Bathroom Ceiling Material Bathroom Wall Tiles Bathroom Size Bathroom Tiles Bathroom Ceilings Bathroom Doors Size Small Bedrooms

Build-In Cast Iron Bathtub is classic design of Enamel Cast Iron Bathtub. Our design of build-in cast iron is simple and classic style.We enamel the inside of bathtub , and paint on the outside of bathtub.We usually pack the Build-in Cast Iron Bathtub by pallet, 10 pieces per pallet,130~150 pieces in 20 feet container.Sanded anti-slip ,faucet,sanded blast logo,handle holes are available as optional by customers.

Build-in Cast Iron Bathtub

Build-In Cast Iron Bathtub,Freestanding Cast Iron Bathtub,Enamelled Cast Iron Bathtub,Build-In Enemaled Cast Iron Bathtub

Linyi Luxing Enamel Co., Ltd. , http://www.luxingbath.com

Posted on