The decoration will be stumped and the remaining balance will be punished

After spending most of their savings on buying a house, the most important issue is how to dress up a new home. However, for most people who have experience in decorating, the decoration is not only painful but also has to fight with the decorating company. Yesterday, the newspaper published the “Nanjing Decoration and Decoration Regulations” that will be implemented next year. Some citizens called the newspaper to ask what kind of real protection the new regulations had done to the decorators.

Employees do not hold a maximum penalty of 5000

According to them, after less than a year of decorating, there was a “wave” on the wall and the wall skin fell away; only in the past two years, the neighbors on the downstairs had reflected the water seepage in their bathroom – after the decoration. The "quality assurance" project, almost every decoration company has its own statement, consumers are always in a passive position. A reporter from the Nanjing Decoration Industry Association learned that the "New Regulations" have made uniform requirements for the "warranty period" of the important decoration components of houses: Residential interior decoration under normal use conditions, the minimum warranty period is 2 years, and there is waterproof The required leak-proof period for the kitchen, bathroom and exterior wall is 5 years.

In addition, the "New Regulations" require that all decorating company staff must hold a qualification certificate issued by the construction department in order to be employed! The "New Regulations" emphasizes that all decorating company staff must hold certificates, otherwise the maximum personal penalty is 5,000 yuan.

Rainwater pipelines may not discharge sewage

In order to pursue the effect of decorating, many decorating companies will carry out a "draconian" transformation of the owner's home. However, some renovations have hidden risks. In this regard, the "New Regulations" made clear protection for the safety of living in the neighborhood of the left and right. In a word, "the decoration cannot be misconducted."

The "New Regulations" require that without the permission of the administrative department of real estate, the bearing beams, columns, plates and foundation structures shall not be changed or removed, the bearing walls shall be removed or the wall cabinets, doors and windows shall be excavated on the load-bearing wall; personal decoration shall not be provided without waterproof measures. The room or balcony is changed to the bathroom and kitchen; the rainwater pipeline shall not be used for discharging domestic sewage; the original energy-saving facilities of the house shall not be damaged, and the energy-saving effect shall be reduced.

If the construction party has caused the wall damage, pipeline plugging, water leakage, water blackout, etc. of the neighboring right owner, the constructor and the fitter shall promptly repair; if any damage is caused, the fitter shall compensate according to law and the damage shall be caused by construction. As a result of the party’s compensation, the decoration person has the right to claim compensation from the construction party after paying compensation in advance.

Before the renovation, we must inform property management

In the past, most people renovated their homes, they were looking for a home improvement company, bought materials, and then they could take a good job and officially start construction. However, the "New Regulations" require that after the decoration person is ready to make his own decoration, he must also inform the property management company in advance before starting work and he must provide: the housing ownership registration certificate, the decoration person is the user, and should also submit The owner of the house agrees with the proof of the changes in the structure of the house; proof of the identity of the owner or user of the house; where the common parts are involved, the certificate of change of the sharer’s consent shall be provided; if the permission is required by the municipal real estate administrative department, the real estate administrative director of the city shall also be submitted. Department's license file.

Entrance decoration children's room decoration decoration house decoration company interior decoration closet closet door kitchen cabinet door bathroom waterproof bathroom door bathroom leak

Store Inspection

Store Inspection,Loss Prevention For Drugstore,Retail Audit Analytics For Drugstore,Retail Audit Analytics For Grocery Store

OP Retail (Suzhou) Technology Co., Ltd , https://www.opretailtech.com

Posted on