Ten steps for home heating and decoration

Heating scheme design

Heating design must be integrated into the overall design of the home-style design. Therefore, the heating designer will carefully communicate with the decorating designer and the owner of the heating needs of each room, and set the location of the radiator (not required for floor heating) in conjunction with the home design. Propose a scientific and reasonable heating solution.

Choose heating products

Next, the designer will calculate the corresponding energy supply according to the heating plan and the owner's preference, select the energy-saving and environmentally-friendly heating equipment, and determine the most suitable product model and overall system configuration.

Hydropower laying

A large part of the heating and decoration is a concealed project. At the same time as the hydropower line transformation and pre-welding of the whole home decoration, the top layer, the wall, the ground and other base layers must be treated, and the installation position of the wall-hung boiler and related heating accessories should be confirmed to ensure the future. Construction quality.

Heating system piping

When the renovation of the heating and hydropower line enters the end, the heating system pipeline is laid, and the heating thermostat circuit is pre-buried. Each step is strictly slotted according to the design drawings to ensure the heating effect of the entire heating system in the future.

Pressure test, bean screed

A pressure test is performed to ensure that the entire piping system is airtight. After 24 hours of the pressure test, the bean leveling (floor heating) can be performed.

Other renovation procedures

After the above steps are completed, other renovation processes in the home can be carried out. During the construction process, the construction personnel must strictly pay attention to the distribution map of the heating pipeline, and construct the heating pipeline to avoid damage to the pipeline.

Installing a fireplace

After the other renovation processes are basically completed, it is time to install the gas fireplace and the radiator (no need for floor heating). The installation position of the wall-hung boiler, the arrangement of the pipe, and the connection of the pipes are all important. The installation of the radiator is required to be level and firm.

Paint repair

After the equipment is installed, it is necessary to carry out paint repair, repair the scratches caused by the construction process, and make the overall home decoration beautiful and uniform.

Equipment commissioning

The engineer will debug the heating system to determine the normal operation of the equipment. After the effective heating meets the design requirements, it will be signed and accepted and delivered to the owner.

User training

Before the first use, the engineer will use the user for maintenance and maintenance. Remind the user to pay attention to the use of the process and after-sales service items, etc., after the user has fully understood the entire process is considered to end.