As we all know, hydropower reform is a very important part of the home improvement process, and it is also the easiest thing to cut corners and ears. Therefore, the owners must strictly check the time of renovation, and then do not suffer endlessly!
First, casually grooving walls and floors without detailed planning
In the process of circuit reconstruction, it is necessary to slot the wall and the ground. The main purpose of the slotting is to embed the pipeline. However, slotting is not free to dig a slot, we must carefully determine the location of the slot according to the design, and pay attention to construction during construction, if it is in the wall with a thermal insulation slot, we must pay attention to slotting It is not possible to destroy the insulation of the house; if it is to be grooved on the ground, it must be taken care not to damage the floor and not to be brutally constructed.
Second, insert strong and weak wires into the same PVC pipe
When carrying out electric wire wearing, some workers who want to cut corners and cut materials will accidentally put strong electric weak wires into the same pipe. This is very easy to cause electricity hazards. Therefore, it is better for the pretenders to purchase electric wires and to have them on the spot. To supervise the worker's electrical wires through the tube, one tube is basically three wires, that is, one set of wires. If it is a thick tube, the galvanized tube can be placed under six wires, and after the installation is complete, the power supply must be checked.
In order to avoid future problems in the circuit, there is no way to test it. The pretender must let the decoration company leave a “pipeline diagramâ€. When the worker had just buried the wire in the wall, he immediately numbered the wall and drew up a plan. Stroke the direction and the specific location of the wire. Pay particular attention to the location of the pipe joint, so that if there is a problem with the circuit in the future, Find out in a timely manner where there is a problem.
Third, pour the garbage into the sewer
Originally, construction waste should be cleared out directly. However, some construction workers directly dump garbage into the sewers in order to reduce the workload. This may lead to the occurrence of water barriers during the use process. Therefore, when carrying out the waterway renovation, the pretender must supervise the workers to clean the garbage and not pour it into the sewer.
Xiao Bian concludes: With regard to hydroelectric reform, the topic of Xiaobian is so many. In fact, as long as the pretenders know more about writing hydropower reform knowledge, and carefully supervise the construction of workers during construction, basically there will be no problems. If you are too lazy to learn decoration knowledge, you can also directly look for supervisors to supervise your site.
Tips: More practical decoration knowledge, real scene with the shoot, please pay attention to the palm of this site (micro signal: mall_jia).
Hydropower renovation