The first batch of support plans for the new material industry in Shenzhen in 2019
Declaration time
Between 21:00 on March 21, 2019 and 18:00 on April 22, 2019
Key support areas
1. Electronic information materials
Focus on high-performance display materials, advanced lighting materials, microelectronic materials and optoelectronic materials.
2. Green low carbon materials:
Focus on supporting high-performance energy storage materials, new solar materials, energy-saving and environmentally friendly materials.
3. Biomaterials
Focus on supporting biomedical engineering materials, bio-based materials, etc.
4. New structural and functional materials
Focus on functional polymer materials, high performance membrane materials, high performance functional ceramics, special corrosion resistant materials, high performance lightweight alloys, high performance superhard materials , special glass, etc.
5. Frontier new materials.
Focus on graphene, 3D printed materials, flexible electronic materials, hydrogen fuel cell materials, new two-dimensional materials, high-performance composite materials, metamaterials, high-performance reinforcing fibers, nano materials and superconducting materials.
Supporting scheme categories and funding criteria
(1) Municipal Engineering Research Center Support Program (Enhancement Project): Prior funding. Funding is provided at 40% of the total investment of the project approved by the evaluation, up to a maximum of 5 million yuan. The funds must be used for project construction investment and research and development expenses. The proportion of investment for construction is not less than 50% of the subsidy amount. The research and development expenses can only be used for research materials and transaction expenses.
(2) Post-industrial subsidy support plan for industrialization: after-the-fact subsidy. The municipal development and reform department will approve the project in accordance with the “pre-establishment and post-subsidy subsidy†method, and the comprehensive review score of 60 points or more (including 60 points) and passed the on-site verification. The project unit must first invest the funds to organize the implementation of the project. After the completion of the project construction and acceptance, the project will be funded after 20% of the total investment approved by the special audit, up to a maximum of 15 million yuan .
The project investment calculation period is generally the project construction period, and the calculation period can be traced back to January 1, 2019. Priority is given to supporting new construction projects. As of April 22, the proportion of completed investment in the project should not exceed 20%.
If the project unit fails to apply for acceptance or fails to pass the inspection within the time limit, the project has not been funded.
Project link:
Http://fgw.sz.gov.cn/xxgk/qt/tzgg/201903/t20190322_16717103.htm
Carbon Crystal Heater is in the microcrystalline particles by adding far infrared emitters and temperature limiting agent with a special process and preparation technology made.it has good performance in Insulation resistance and flame retardant. When the carbon crystal heater is electrified, it will produce heat in 3-4 minutes. After 3-5 minute, you will feel suitable temperature. The application of the Carbon Crystal Electric Heater has saved the energy and reduced heating coats to a large degree.It's not only warm your room, but also decorate your room.
Carbon Crystal Panel Heater,Carbon Crystal Infrared Panel Heater,Carbon Crystal Panel,Infrared Room Heating Panel
Shandong Dexiang Electrical Technology Co.,Ltd , https://www.heater-kerosene.com