Asphalt pump installation of the five precautions and the use of norms: We use the asphalt insulation pump when we must develop a strict technical maintenance specifications, the fuel filter 100 hours of work, the fuel tank to work 500 hours of cleaning time, if it is found that the filter Breakage failure should be promptly replaced, shall not be removed and the use of DC-type fuel supply. Even working under normal working conditions for 500 hours should be disassembled once. In the inspection and disassembly of asphalt insulation pump to ensure that places, hands, tools and cleaning oil clean, so as not to be contaminated. During disassembly, please do not chaos, play chaos, do not mess up when cleaning, do not wash basin with other non-even pieces, so as to avoid bumps and bruises. Do not change the assembly position at assembly to achieve some of the objectives of the machine does not meet the requirements of the work. When the oil valve seat and the oil tight cap are installed, it shall be tightened according to the specified torque to ensure the good technical condition of the assembled fuel injector and fuel injection pump. Understand the structural features and working principle of the coupled parts, strengthen and improve the maintenance of dual parts, operation, trouble-free do not arbitrarily adjust, maintenance, use, not disassembled, maintenance, chaos, chaos, cleaning maintenance Chaos rubbing touch, the assembly does not change when chaos twisted screw adjustment, all according to the technical requirements of bitumen insulation pump to achieve the purpose of extending its service life. 1, the installation should pay attention to the arrow on the valve body should be consistent with the media flow. Do not install in places with direct dripping or splashing water. Asphalt heat pump should be installed vertically upwards. 2, asphalt pump should ensure that the supply voltage is within the range of 15% -10% of the rated voltage fluctuations within the normal work. 3, asphalt insulation pump installed, the pipeline may not have the reverse pressure. And need to power several times to make it suitable for temperature before formally put into use. 4, asphalt insulation pump should be thoroughly cleaned before installation of the pipeline. Access to the media should be free of impurities. Pre-filter valve. 5, when the bitumen insulation pump failure or cleaning, in order to ensure the continued operation of the system, the bypass device should be installed.
Small Tape Measure,Automatic Tape Measure,Construction Tape Measure,Stainless Steel Tape Measure
HENAN SHIJI HUALIAN TOOLS AND MEASURE CO.,LTD , https://www.hnsjhl.com