Details that are easily overlooked when the decoration is completed and accepted

What are the details that are easily overlooked when the decoration is completed? Today, Xiao Bian gives you some inventory of experience, hoping to give you some suggestions for renovation! 01 Paint 1. The surface color is correct and uniform, the light is smooth and moderate, there is no sagging, wrinkled skin, too thick, bottom, blistering, anti-white and so on. 2. The paint is straight and tidy and the wood oil is out of bounds.
3. Latex paint is seen at a distance of 1m, no wrinkles.
4. The color of wooden nails should be accurate and smooth. Hardware accessories and glass should be clean.
The wallpaper should be accurate, fit, and free from blistering. According to the regulations, the flower should be cut with a sharp blade, and there should be no tearing of the paper edge.
02 wallpaper 0/3 Carpentry 1. Structure - Check whether the construction of the carpentry project is straight (whether in the horizontal or vertical direction, the correct carpentry practices should be straight and flat); 2. Modeling - carpentry project should be the surface Flat, no drum or broken phenomenon. Symmetric woodworking projects should be symmetrical; 3, corners - normal corners in carpentry design are 90 degrees, with the exception of special design factors; 4, parquet - woodworking projects must be closely and accurately. The correct wooden parquet, to achieve a seamless gap between each other or to maintain a uniform distance; 5, cracks - line and line mouth corner seam does not exceed 0.3mm sealing line, corner line, waist line decoration panel contact seam does not exceed 0.2mm , The interface between panel and board is not more than 0.2mm, and the error of sliding door is not more than 0.3mm. 1. PVC pipe or black iron pipe used in the wall line shall not be used as a method of digging the wall to embed the wire.
2. The laying of open lines should be as tidy and beautiful as possible, especially at the corners, and the distance between line codes should be equal. 3. The cables in the cabinet shall be as concealed as possible. Every 200mm shall be fixed with a glue code. 4. Larger power equipment (such as air conditioners, electric water heaters, etc.) should be wired separately. 5. The leakage circuit breaker shall be set as the master switch in the incoming distribution box. Leakage current is 30mA. 6. The electrical device should be firmly connected and in good contact. The non-charged metal part should be grounded reliably and the ground wire should be installed. 7. The height of the switch is 1.3m from the ground. 0.2m from the door frame. Bathroom sockets should use splash-proof sockets. 8. The weak current system and the electric lighting circuit shall not be laid with the pipe, and shall be installed with the connection box. 04 Electrician 05 Paving tiles: 1. The tile surface should be flat, the angle should be accurate, the edges should be neat, and the edges and corners should be complete.
2. The kitchen floor should be suitable for inclined water (2%). 3. After cracking the tile, use a rattan brush to clean the cement mortar, and do not leave cement ash on the brick surface. Carpets 1. Carpet spellings must be on the pattern and on the direction of the blanket fur. 2. With aluminum edge, can not be directly hit with a small hammer, you must first use wood blocks and then tap, so as not to cause dents. 1. Slots should not be larger than 0.2mm. Padded larch should be used, Benson, Zamu. Specifications shall not be less than 45mm x 25mmo The length of the fixing screw shall be 2 to 2.5 times the height of the sluice gate.
2. The new Maple floor should use 9-12mm plywood as the bottom, the bottom of the board should be placed with linoleum or plastic paper waterproof, and the edges should be set aside 10-20mm, covered with skirting edge. Crystal floor oil at least three times. 3. The floor must be smooth, no recesses or marks, and the corners should be ground with a small grinder. 06 floor, floor wax

Completion Phase New House Acceptance Notes Construction Acceptance

Aluminum Sunroom Profiles

Aluminum Sunroom Profiles,Aluminium Unitized Curtain Walls Extruded Profile,Solar Pannel Frame Aluminium Profile,Aluminum Solar Pannel Frame

Guangdong Jihua Aluminium Co., LTD , https://www.jihua-alu.com

Posted on