Heating radiator installation details

In order to allow everyone to enjoy the warmth of the radiator faster and better, and use the heating more safely and comfortably, the Edinburgh Radiator reminds users who are ready to install the radiators to prepare these seven things before installation.

Heating radiator installation precautions must be done before installation

1. Ask the staff to see the house on the spot. You can't just go out with a floor plan. The radiator of a renovated house is different from the radiator of an unrenovated house. The site must have detailed communication and make reasonable suggestions.

2. For bathroom heaters, it is best for the owner to provide detailed plans for the layout of the hydropower. Because there is no drawing for the line pipe line, it is not necessary to know where the pipe line is. It is necessary to contact the decoration company or project manager to avoid damaging the hidden work of the bathroom.

3. After checking the house structure on the site, you can design the HVAC scheme according to your needs. But it should be noted that the surface mounted radiator pipe is a clear pipe, the heat loss is greater than the dark pipe, so when the heat distribution is greater than the dark pipe! Otherwise it will not heat up.

4. Began to enter the market, safety is the most important! This requires the construction workers to have good quality and strict management of the company. After installation, the church consumers use and debug the boilers on a daily basis, and inform the maintenance and Other matters needing attention.

5, because it is a renovated house, so construction must pay attention to protect the owner's home decoration, it is best not to destroy the decoration on the basis of construction. At the same time, it is necessary to negotiate well before the construction and cover the furniture and home appliances with plastic sheets. Therefore, before installing the heating, it is necessary to go to the service site of the service provider to see whether the construction protection of the construction site is done.

6, Although the surface mounted radiators are convenient for later maintenance and repair, due to the constraints in the installation, the construction difficulty has increased. Therefore, we must pay attention to the pressure test and pressure maintenance process, and the perfect pressure data is the best proof of eliminating the potential for water leakage. In order not to destroy the existing decoration, when installing the heating pipe will inevitably cause holes in the wall, so pay attention Remind builders to protect the details on the wall.

7. Install the radiator as far as possible in the area where the air convection is more strong, such as under the window or at the door, so as to ensure the effect of indoor heating.