Process flow:
1, familiar with drawings, according to plan construction. Use a horizontal tube to copy the horizontal line and use the ink line to eject the baseline. For a partially suspended ceiling room, if the original ceiling is not horizontal, the ceiling shall be made as a horizontal or smooth roof, and shall be determined by the client after soliciting opinions from the designer.
2. The top shape of the arc should be laid out on the ground first, and the top surface can be smooth after ensuring that it is correct.
3, ceiling main reinforcement not less than 3 × 5 wood keel, spacing 8-1, must use 1 × 8 steel expansion fixed, about 1
1, familiar with drawings, according to plan construction. Use a horizontal tube to copy the horizontal line and use the ink line to eject the baseline. For a partially suspended ceiling room, if the original ceiling is not horizontal, the ceiling shall be made as a horizontal or smooth roof, and shall be determined by the client after soliciting opinions from the designer.
2. The top shape of the arc should be laid out on the ground first, and the top surface can be smooth after ensuring that it is correct.
3, ceiling main reinforcement not less than 3 × 5 wood keel, spacing 8-1, must use 1 × 8 steel expansion fixed, about 1
Construction acceptance ceiling installation room