Wooden flooring is now almost inseparable from our lives. Whether it is home decoration or public dress it has become a trend. It is necessary to establish basic requirements for the inspection and acceptance of wood floor coverings.
Brand shop: Xinglin solid wood flooring
Here are some acceptance methods for the laying of wooden floors:
1. The materials and grades of wood flooring are in line with the design requirements. The moisture content should be around 10, and whether the keel and studs are checked before laying is treated as anti-corrosion treatment. The wood keel should be installed firmly and straight, and the spacing and fixing method should meet the requirements of the specification. , The board surface is studded with firmness, no looseness, firm paste, no emptying, and the type of glue used meets the specification requirements.
2, the test to test the surface of the laying of the wooden floor surface planing, polishing, no scars, Russian burrs and burrs, the pattern is clear, the same color of the oil surface, the laying direction is correct, the surface seam tight, the joint position is staggered, the surface clean. The skirting boards have tight joints, smooth surfaces, and a uniform height and wall thickness. With a 2-meter ruler check, the surface lay flatness error is less than 1 mm, the gap width is less than 0.3 mm, and the flatness tolerance of the mouth lay is less than 3 mm, and the flatness error of the seam is less than 2 mm.
Wood floor construction laying common quality problems and treatment methods:
1. The common quality problems in the laying of wood floors are the sound of empty drums when walking, the unevenness of laying surfaces, lax seams, and local warping drums.
(1) The sound of empty drums: The reason is that the laying of the wooden floor is not fixed. The main reason is that the number of the board and the keel, the board and the floor nails are not enough or the nails are not firm. Sometimes the shrinkage or glue is caused by the change of the moisture content of the board. Liquid failed. In addition to the strict acceptance of control methods, moisture content, adhesive and other quality, can only be used after acceptance, outside the installation should not be too little nails, and should ensure that the nails, after each laying a wooden floor, with no foot after the foot test sound loaded A piece, if any sound should be reworked immediately.
(2) Uneven pavement surface: The main reason is that the laying of the grass roots is not flat or the wooden flooring strip deforms. During the construction of the paving, the horizontal ruler shall be used to check the level of the surface of the keel. If the paving is uneven, the paving shall be adjusted. Ventilation slots should be made on the keel. A 10 mm ventilation gap should be left on the edge of the wall. The insulation material must be dry to prevent arching after the floor is wet. The flatness of the wooden floor surface should be within 1 mm.
(3) Slotless lacing: In addition to the non-standard laying during construction, the large width and size of the plate and the poor quality of the machine are also important reasons. In addition to careful inspection of the floor quality during the construction, the installation should be Meikou. To nail nails in front of the board and use the module to mold the floor gaps and nail them.
(4) Partial warping drum: The main reason is that in addition to moisture deformation of the board, there are also small or seamless seams on the wool board, which is caused by the leakage of water in the floor and wet floors. In the construction period, 3 mm gap should be left when installing the wool board, and wooden keel carved ventilation slots. After the floor is covered, the paint on the floor paint should be complete. In daily use, water should be prevented from flowing into the lower part of the floor, and the surface water must be cleaned in time.
Estimated duration of wooden floor construction:
The laying of wooden floors is a very technical project and should not be paralleled with other projects. It usually takes one week to complete the construction task of three rooms and two halls, in which the wooden keel is installed and the base layer is protected from moisture for two days. The fur boards and the floor are installed for two days. The floor surface is polished and polished for one day, and the floor paint is applied for two days. The actual paving method requires less labor than the empty paving method, and the floor specifications are larger than those of the small-size ones. The elements of the quick-drying of the floor paint are slower than the elements and the specific time should be determined according to the construction method, materials, etc.
In the acceptance process, we must bear in mind these standards and leave no room for our lives.
Recommended Links: Floor Receipt Must Be Counted
Recommended Links: Base Project Acceptance Specification - Ground Flooring Project
Ground acceptance paint home improvement
The utility model discloses a Kitchen Shower head that is convenient to switch the water outlet mode, has a compact structure, and is easy to use, and a kitchen faucet using the kitchen shower head. , The shower head is provided with a water separator, and the water separator is provided with an annular flow channel and an inner flow channel respectively connected to the spray water outlet body and the V-shaped water outlet body, and the lower end of the outer wall of the water separator is upwardly circular A plurality of water inlet holes connected to the annular flow channel are provided, and a first sealing ring is provided on the lower side of the water inlet hole; the water outlet end of the shower body is connected with a converter, and the converter is provided with a communicating In the water diversion cavity at the water outlet end of the shower body, the lower end of the water diversion device is installed in the water diversion cavity and can move up and down, and the upper end of the inner wall of the water diversion cavity is provided with a convex ring matching the first sealing ring, so The bottom surface of the water diversion cavity is provided with a sealing gasket that can seal the inner flow channel.
Waterfall Shower Head,Overhead Shower Head,Push Button Hand Shower,Brushed Nickel Sink Faucet
Yuyao Zelin Sanitary Ware Co., Ltd , https://www.kitchen-sinkfaucet.com