Talking about: Specification and Construction Plan for Full Scaffolding

With the continuous rise of people's economic level, our demand for housing is also constantly improving. Especially in recent years, more and more users have begun to decorate their houses in our country. When it comes to the decoration of a house, we cannot but say the tools that we must use to decorate it. It is full of red scaffolding. Ordinary scaffolding is suitable for the construction and decoration of low floors or interiors. On large construction sites, full-red scaffolding is visible everywhere. It is an important tool for the construction of construction sites. The scaffolds are large in scale and have a strong effect. Security is particularly important. Therefore, special attention should be paid to the building of red scaffolding specifications during the installation process. Today, I mainly introduce the specifications for full-scale scaffolding installation . I hope to help friends who have this need!

Full Red Scaffolding Price

Full house red scaffolding costs between 599 yuan and 10 to 49 meters. The interior wall decoration of 3.6 meters or more is no longer calculated for decorative scaffolding. The masonry scaffolding of the interior wall is still calculated according to the provisions of scaffolding.

Note: This price is for reference only! Due to geographical differences, of course, the price will be different. For more details on the prices, please refer to the local distributors!

Full House Scaffolding Calculation Rules

1, horizontal protection frame, according to the actual projection of the horizontal projection area calculation.

2, vertical protection frame, according to the natural floor to the highest level between the level of cross-bar height, multiplied by the actual installation length, calculated in square meters.

3, masonry scaffold scaffolding, regardless of single tube or silo group are based on the outer perimeter of the single cylinder, multiplied by the height between the design of the outdoor floor to the storage silo, calculated in square meters.

4, storage (pumping) pool scaffolding, according to the perimeter of the outer wall multiplied by the height of the outdoor floor to the top of the pool wall, calculated in square meters.

5, large-scale equipment base scaffolding, according to the perimeter of its shape by the floor to the height of the top border between the surface, in square meters.

6, overhead transport scaffolding, according to the length of the installation to extend the meter calculations.

7, chimneys, water tower scaffolding, different from the height of the calculation: the elevator shaft scaffolding, according to a single hole in the seat calculation: ramp different heights in the seat calculation.

  

Full Red Scaffolding Cost Calculation Rules

For a floor height of 10m, the calculation is based on full scaffolding calculations (more than 3.6m full house calculations). A basic floor is calculated from 3.6 to 5.2m. If it exceeds 5.2m, it is calculated as (floor height -5.2m) 1.2m. The remainder is more than 0.6m. layer. The calculation method is based on the calculation of the indoor net area (ground)-----this is the calculation of scaffolding scaffolding. Some people think that the total scaffolding, the wall project will not have to calculate the scaffolding, I do not agree, so the wall project should be counted once (if the original wall 3.6m, then apply the wall cylinder activity scaffolding), due to height 10m, I think another calculation of a single row scaffolding (calculated according to the wall area, do not deduct the doors and windows).

Full Red Scaffolding Installation Specification

1. Prior to erection, the rod fittings shall be inspected. Dry fittings with unqualified specifications and quality shall not be used.

2. The bar of the scaffold cannot be mixed with steel and wood. The steel pipe must be connected with qualified fasteners, and it must not be randomly bundled with lead wire.

3, in the scaffolding process, must have a unified command.

4. When constructing the surrounding scaffolding, it should be started from an angle and then extended to the two sides for cross-building. The poles should be erected once according to the positioning, and connected and fixed with the vertical and horizontal sweeping poles, and then the first step should be installed. Lateral and longitudinal steel pipes, which are then fixed after correcting the vertical bars, are to be carried out in accordance with this procedure. The end of the bars that crosses out shall not be less than 10 cm.

  

5. Scaffolds need to be laid with necessary scaffolding boards to facilitate workers' work. The scaffolding boards must be temporarily fixed. Workers must wear safety helmets and hang safety belts. When heavy dry fittings are installed, they cannot be performed by one person. Cooperate to avoid accidents.

6. During the erection process, no changes may be made to the setting of dry fittings or the design of the structure. If there is a need for modification, it must be communicated with the technical staff. Only after the technicians check and study can the decision be made.

7. At the end of the operating surface of the scaffolding board, two body guard rails and a 200-meter footrest must be provided, and a secure safety net should be attached to the side.

8. The overlapping positions of the upper and lower crossbars must be staggered and the distance from the adjacent pole must not be greater than 1/3 of the vertical distance.

9. The same row of bars should be kept at the same horizontal position. If there is any deviation, the deviation cannot be greater than 1/250 of the length of the entire scaffold and it cannot exceed 50 mm.

10. The adjacent large bars should be staggered on the inside and outside of the poles, and the opening direction of the docking fasteners should be set up or inward.

11. In the operation layer construction, a large-eye safety net needs to be installed below the operation layer.

Editor's summary: The construction design of the full-red scaffolding is brilliant. Each frame has a very detailed calculation. Every aspect of the requirement is calculated with precision. Therefore, the full construction of red scaffolds has attracted the attention of many citizens. The number one program came out and it reduced many unsafe accidents for the entire project. The full construction schedule of the Red Scaffolding has been supervised by the construction team from the beginning to the completion. All the above problems have shown that the construction scheme of the full human scaffolding is worth our recognition.

Construction and installation decoration construction knowledge construction color matching scheme construction contract full red scaffold erection specification

Aluminum Casting Machinery Parts

Aluminum Casting Machinery Parts,Aluminum Machinery Parts,Agricultural Machinery Parts,Machinery Spare Parts

NINGBO AIKEHAN METAL PRODUCT CO.,LTD , http://www.diecastingsupplier.com

Posted on