Home decoration is generally divided into five aspects of acceptance (water, electricity, tile, wood, oil). According to the national acceptance criteria and the quality acceptance standards agreed in the construction contract, all aspects of the project are accepted. As the non-professional acceptance of the owner, the following points should be noted:
First, the water: pool, basin, sanitary ware, water pipes, heating and so on.
Look at: whether the installation of the pool, basin, and sanitary fixture is smooth, firm, and straight; whether the upper and lower waterway pipelines are straight, whether the fasteners have been installed, and whether the joints are leaking and seepage.
Second, electricity: power lines (sockets, switches, lamps), television, telephone.
Look: Whether the power line uses the national standard copper wire, the general lighting and socket use the 2.5 square line; the kitchen and bathroom use the 4 square line, if the power line is multi-strand wire but also solder processing can be connected to the switch socket; TV and telephone The signal line should be kept at a certain distance from the power line (not less than 250mm); the installation of the luminaire should use a metal hanging point, which should be tested one by one after completion.
Third, tile: tile (wet paste, dry paste), stone (wet paste, dry hanging).
Look: Before the construction, we must pre-screen the pre-selection process. Divide the materials of different specifications into several categories and place them in different rooms or planes to align the brick seams. Use the material of the individual curling angles as the cutting material. Make better quality materials with lower quality.
Fourth, wood: doors and windows, ceilings, wall cabinets, wall skirts, heating cover, floor.
Look: Select wood must be selected to dry the material, so as to avoid future deformation; wood to be painted with fire-resistant anti-corrosion materials can be used before, blockboard to use high quality materials. Large-area ceilings and wall skirts shall have no less than 8 fixed points per square meter. Metal hanging points shall be used for suspended ceilings, and the doors and windows shall be made of better materials to prevent deformation. The wood on the floor should be larger (not less than 6×6).
Fifth, oil: paint (clean oil, mixed oil), paint, paste, soft package.
Look: The most important thing is the surface treatment of the decoration. The paint must be made of high-quality materials. Before the brushing or painting, the surface treatment must be done. The mixed oil is first put on the surface of the wooden device and the putty is smoothed. After the polishing, the paint is sprayed on the surface. Before using a wall paint, be sure to use a primer (in order to isolate the acid and alkali reaction between the wall and the top coat) to prevent discoloration of the wall.
Three trees paint living room ceiling paint socket TV decoration switch heating floor tiles kitchen ceiling cabinets closet doors floor tiles ceramic tile specifications
Lockshield Radiator Valve,Wheelhead Radiator Valve,Angled Lockshield Valve,Radiator Valve And Lockshield
Ningbo Safewell Plumbing Co., Ltd. , https://www.safewellbrass.com