Anchor and housing installation

The mounting process of the suspension method was determined when the anchor installation scheme was developed. A rigid support frame is arranged at each bearing seat position. The support frame is located on the steam turbine foundation scaffold. Each support frame column is composed of four double channel steels. The beam is divided into two layers. The upper layer of the frame is higher than the anchor height by 1 m. The channel consists of a movable double channel steel on the support frame for suspending the anchor. The anchor and the hanger are connected by M16 blue bolts to adjust the center and level of the anchor. After the concrete is poured, the elevation tolerance of the anchor is positive. When the anchor is installed, the movable beam of the upper frame is welded, the blue bolt is fixed, and the steam turbine foundation is poured.

The bearing housing has no platen, and the bearing housing is directly poured onto the steam turbine foundation during the secondary watering. When the bearing housing is processed at the factory, the bearing is always loaded into the bearing housing, and the center of the bearing is at the same height as the middle surface of the bearing housing. When the field is installed, the adjustment of the bottom adjustment gasket of the bearing is less than 0.3mm, and the deflection curve of the steam turbine is controlled by the installation height of the bearing housing. In order to meet the design requirements of the turbine deflection curve, the installation requirements for the bearing housing are as follows.

(1) The absolute height error of the bearing seat is 21mm, and the relative height error of each bearing seat is 20.1mm; the lateral center error of the bearing housing is 20.1mm with respect to the longitudinal axis of the steam turbine.

(2) Relative to the transverse centerline of the unit, based on the transverse centerline of the bearing housing, the longitudinal center distance error of each bearing housing is 22mm.

According to the German design idea, if the installation of the bearing housing is zero error, when the turbine rotor is in place, the coupling center of the rotor does not need to be adjusted to meet the installation requirements.

Heat Circulation Bath

Lab stainless steel Heat Circulation Bath is used for heating transfer in the chemistry laboratory industry. You can put water or into bath and stainless steel heating elements have been built into bath so it is always used for heating from room temperature to 200℃.


High temperature circulating tank or Stainless steel circulating water oil bath always used for chemical Jacketed Glass Reactor for heating and always with temperature sensor and temperature control system .



Stainless steel water oil circulation bath or lab heat circulator or lab thermostatic bath with excellent properity such as raising temprature fast , temperature even, high accuracity.


High temperature circulating bath size 10l 20l 30l 50l 100l 150l and 200L



If you need heating and cooling circulation bath or heater and cooler for laboratory , heating cooling circulation bath , Please contact us for more details . Thank you !






Lab heated circulating bath ,Heating cooling circulation bath,Heat Circulation Bath,Hot Water Circulation, circulating laboratory bath

Zhongyi Kori(Zhengzhou)Equipment Co.,Ltd , https://www.korireactor.com

Posted on