A new experience in the shower room installation reveals the mystery of the shower room

The shower room of glass products brings comfort and convenience, but also brings troubles. There are many incidents of explosions in the shower room. After the quality of the shower room is closed, the installation and maintenance of the shower room will have a certain impact. . In this issue, we will bring you a detailed explanation of the installation of the shower room, understand the detailed steps of the installation of the shower room, uncover the mystery of the shower room, and create a refreshing bathroom!

Simple shower room installation steps

1. Prepare the necessary tools for use.

2, the installation of the bottom basin: combine the bottom pot parts, adjust the level of the bottom basin, to ensure that there is no water in the basin, the bottom of the basin. The hose can be telescoped with distance, and the bottom of the basin is firmly connected to the floor drain.

3. Test and protection: After installation, water test should be carried out to ensure unimpeded flow. Fourth, find a position, punch: use a pencil, level to determine the drilling position of the wall aluminum, punch with a hammer drill.

4. Install aluminum: Knock on the rubber in the hole and lock the aluminum bar to the wall with screws.

5, fixed glass: the glass is clamped and locked in the bottom hole of the bottom basin, and then fixed with screws.

6. Install the top tube: find the corresponding position drill hole above the fixed glass, install the (straight/oblique) fixed seat and connect the top tube. Secure it to the top of the glass with a bent sleeve.

7. Installation rack: Align the position of the device rack, tighten the layer nut, and fix the laminate glass to maintain vertical and horizontal. Be careful to waterproof under the fixed glass of aluminum.

8. Install the movable door: Install the hardware of the movable door and install the hinge on the reserved hole of the fixed door. After installation, adjust the position of the shaft of the lotus leaf until the door feels the best.

9. Make waterproof: Install the suction strip or water retaining strip on the side or below the glass as required. Use aluminum mesh to seal the seam between the aluminum and the wall, glass and bottom basin.

10. Debugging and fastening: Check whether all parts are comfortable and smooth, and find problems in time. After adjusting, tighten the corresponding screws to make the whole shower room firmer.

11. Finishing work: The decorative aluminum strip is stuck in the aluminum wall of the wall to ensure that its appearance is neat and generous. Finally, wipe the entire shower room with a rag.

Global hardware network

Concerned about surprises

Tags: shower room installation new experience to unveil the mystery of the shower room

Previous: Steel door selection takes four steps Next: Maintenance of aluminum alloy doors and windows

Bolts

Jiangsu Dingtian Stainless Steel Products Co., Ltd. , https://www.dingtiancasting.com