Home decoration acceptance standard reference

Acceptance In addition to identifying the overall effect of decoration, the main thing is to see if the quality of the hand is satisfactory. Acceptance can be identified from the following aspects: 1. Sanitary appliances and plumbing installation 1. The types, specifications and colors of sanitary appliances should meet the requirements of design and households, and the quality of products such as pipes and fittings should comply with the current standards. 2, the pipeline installation should be horizontal and vertical, laying firm, slope meet the requirements, switches, faucet installation is flat, flexible and convenient use, Ming Guan brush anti-rust paint, dark pipe brush tar removal. 3, The water supply pipe and its accessories are tightly connected and there is no leakage through the water pressure test. 4, The drainage pipeline should be unobstructed, no downslope, no clogging, no leakage, and the floor drain should be slightly lower than the ground. 5, Sanitary appliances are flat and firm, with no damage to their appearance. Second, electrical engineering 1, electrical product materials must be in line with the relevant standards of qualified products, electrical construction personnel should hold certificates. 2. The electrical wiring should adopt dark pipe laying. The wire should not have knots and kinks in the pipe. It is forbidden to directly bury the wire in the plaster layer. 3, "Fire line into the switch, the zero line into the lamp", socket wiring, facing the socket should meet the "left zero right fire, grounding on the" provisions. 4. The switches and sockets are securely installed, the position is correct, the cover is positive, the surface is clean, close to the wall, there is no gap around, and the height of the same room switch or socket is the same. 5, After the completion of electrical construction, necessary experiments such as: electrical power, lighting test, switch test control, etc. 6, When the project is completed, the occupants shall be provided with a schematic drawing of the wiring work, indicating the direction of the conduits for the conduits. 3. Ceiling construction 1. The types, specifications and colors of the materials used in the ceiling project shall be designed according to the design and the requirements of the households and shall comply with the current standards. 2. The ceiling keel of the ceiling shall not be distorted or deformed. The installed ceiling keel shall be solid and reliable, with an allowable deviation of ±5 mm around the perimeter. 3, The light fixture can be hung on the main keel, and the fixture or ceiling fan with the weight more than 3 kilograms must not be connected with the keel of the ceiling. A separate hook should be provided. 4, ceiling panels and keel should be connected closely, the surface should be smooth, no pollution, demolition, lack of edge, drop angle, hammer and other defects, meet every should be uniform, bead straight, no warping, cover panel with Walls, curtain boxes, lamps and other junctions should be tight. 5, The paper plaster cover panel is generally 9 mm thick, and is fixed on the keel with galvanized screws. The nail head should be coated with rust paint. The affixed cover panel must not be delaminated, and the cover panel of the shelf must not be leaked, penetrated or warped. Fourth, doors and windows, sealing the balcony project 1, the variety of doors and windows, opening direction and installation location should be designed according to the requirements of households, and in line with current standards. 2. The quality of doors, windows and accessories must conform to the current standards. Aluminum alloy doors and windows should be made of stainless steel or galvanized zero accessories. 3, doors and windows must be installed firmly, horizontal and vertical, uniform height, appearance, no deformation, open welding, fracture phenomenon. Frames and form gaps should be filled with full dense, smooth surface, no cracks, anti-corrosion treatment must comply with relevant requirements. 4, door and window fan should be open and flexible, no block and rebound phenomenon. Hardware accessories should be complete and correct. 5. The surface of the door and window should be clean after installation. There should be no scratches, bumps or rust on the large surface. The coated surface is smooth, uniform in thickness, and free from porosity. V. Fine wood product works 1, fine wood products (curtain box, heating cover, wood retaining wall, wooden cut, bag door and door cover, window cover, skirting board, floral decoration, decorative line) and fixed furniture keel, liner and The fabric should meet the design and household requirements. The moisture content of wood used for fine wood products shall not be greater than 12%. The external materials used shall not have dead knots, insect eyes and cracks. 2, fine wood products and base must be studded firmly, no loosening. The liner and the panel must be firmly bonded and no layering or druming may occur. 3, The sill plate and curtain box are firmly connected with the base body, the surface is flat, the edges and corners are square, the lengths outside the window holes on both sides thereof must be the same, and the sill plates or curtain boxes in the same room must have the same elevation. 4. The surface of the wooden retaining wall should be smooth and clean, with square edges and corners, straight lines and uniform colors, no crack opening and no glue, and seamless connection with the baseboard. The skirting board should be straight, clean and smooth, and the thickness of the wall should be the same. 5. When wood hanging lines such as mirrors, vertices, etc. are docked, a 45-degree glued slope should be used, and joints must not be staggered or separated. The decoration line is required to be straight and even, close to the wall, and close to the circle. 6. After the cabinet and wall cabinet are installed, they should be securely installed, and the door can be opened flexibly. 7, fine wood products should be smooth, no brush marks, uniform color, no glue marks. Sixth, paste project 1, wallpaper, wall coverings of the species, color and pattern, should meet the design, the requirements of households, adhesives should be selected wallpaper and wall cloth varieties. 2. The substrate of the paper-removal project should be dry, the surface should be flat, and the seams of the base materials of different materials should be pasted with joints. 3, the base putty should be solid and strong, can not afford skin and cracks, the base layer should be brushed varnish before the paste for sealing treatment. 4, wallpaper, wall cloth must be firmly attached to the surface, the same color surface, no air bubbles, hollowing, cracks, Alice, wrinkles, stains and adhesive marks. Each piece of mosaic is horizontal and vertical, with no formal seams at a distance of 5 meters. 5, yin and yang feet vertical, angular, glaring at the corner of the sun, no seam at the corner.

7. Decorative panel (brick) engineering 1. The types, specifications, colors and patterns of stone and wall and floor tiles shall meet the requirements of the design and households. The surface of the decorative panel shall be free from defects such as scratches and missing corners. Do not use expired and agglomerated cement as cement. 2, stone, tile and floor should be checked before the construction of its specifications, colors, bricks and tiles as much as possible to reduce non-complete bricks, and the use of appropriate parts, with protrusions should be set according to the regulations. 3, stone paving should be flat and firm, joints straight, no skew, no dirt product and plasma marks, clean surface, color coordination. 4. Wall tiles should be flat and solid, with clear patterns, no dirt product and no traces of grime. The surface color is basically the same, the joints are even, the plates are not cracked, drop angles and lack of edges, and the local blanking drum must not exceed 5% of the total number. 5, The floor of the kitchen and toilet shall be waterproof and shall be turned upwards and not less than 250 mm above the ground. The surface water layer of the ground surface drains to the ground, and it does not flow backwards or water, and there is no leakage during the 24-hour storage experiment. 6. The material, structure and pattern of wooden floor should meet the requirements of design and households. The moisture content of wood should not exceed 12%. 7. The laying direction of strip wood floor can ask the users' opinions. Generally, the corridor and aisle should be laid in the direction of walking. The indoor room should be laid out along the light. A 10 mm gap should be left between the wooden floor and the wall and covered with a skirting board. 8, wooden board surface layer must be nailed firmly without loose, paste firmly without empty drums, surface polished smooth, no planing marks, flaws and burrs and other defects. 9, wood surface layer, the gap between the plate is basically tight, the joint position is staggered; parquet joints of the surface layer of the parquet, sticky, nail tight. No cracks, warping, no significant color difference in surface cleanliness. 10, Wooden skirtings have tight joints, smooth surface, and the same height of the wall thickness.

Doors, windows, villas, Design windows, Switch sockets, paint, ceiling, ceiling, light, closet Doors, kitchen Doors, floor, brick Wall cabinets Doors, bathroom Doors, bathroom, ceilings Materials, bathroom suspended ceilings, bathroom, toilets, bathroom Bathroom tiles

Underwater Light

IP68 Waterproof, with a thick silicone O-ring for waterproof sealing. Fully submersible and completely sealed design. Suitable for any container filled with water. Built-in heavy ballast, so it can sink into the water well. High quality lamp body, fully sealed design, high temperature resistance, maintaining reliability and durability. Up to 50000H working time. Low power consumption, overcurrent protection, high stability. Widely used in swimming pools, bathtubs, home aquariums, fountains, ponds, waterfalls, salt water and seawater environments. Jiangmen Synno Co., Ltd is a high and new-tech enterprise. Our company specialized in LED green light source. And we are engaged in medium and high-end LED decorative lighting with a whole set of design and manufacture of lamps and lanterns, development of control system and engineering supporting service. Our company is devoted to provide customers with LED application products. Synno has got through ISO9001 quality system certification of SGS of Switzerland, CE certification of European Union, GS certification, ROHS certification and relevant domestic LED lamps and lanterns certification.

Under water Light,IP68 Underwater Lights,Under water Led Light,Underwater RGB Lights, Stainless Steel Underwater Light

Jiangmen Synno Lighting Co., Ltd. , https://www.synnoled.com

Posted on