The renovation period is a problem that the owners are very concerned about during the renovation process. However, the postponement of decoration is widespread. Seeing that the decoration time is extended day by day, the owners are tested both psychologically and economically. Let's turn the time back to the start of the renovation. In order to avoid delays in the postponement of renovation, what should the owners actually do?
First, how much is the decoration period? |
Factors affecting the length of renovation before renovation
About 100 flats for house renovation
Second, why is the decoration delayed? |
Homework extension is only completed in February only blame the "workers too popular"
Decoration program changes ceaselessly
The main material failed to enter the site on time
The acceptance is not on time or the project payment is not timely
Rework due to non-compliance of construction quality
Third, how to postpone the decoration delay? |
Select professional decoration company
Pre-decoration planning in advance
Timely acceptance and settlement of project funds
Clear relevant terms when signing the contract
Fourth, how to solve the delay in decoration? |
Distinguish the reason and responsibility of the decoration delay
In accordance with the contract service
Fifth, on the decoration of some other small knowledge |
How long does the construction period take?
How is the duration calculated?
What issues need to pay attention to during the shutdown?
The length of the renovation period is ready to be anxious
When buying a new house, of course, it is hoped that they will be able to live in as soon as possible. The length of the renovation period has become a special concern for the owners. Due to the difference in the number of objective factors such as the decoration area, the length of the renovation period is not the same. There is always a reference to everything to know where the difference is. Let's take a look at some of the knowledge about the renovation period below.
First, the factors affecting the length of renovation before decoration
1, the size of the decoration area
In general, the larger the decoration area, the longer the natural decoration time is relatively smaller. Ordinary apartments of about 100 square meters may be renovated in more than a month, while several hundred flat villas may not be completed for six months.
2. How many renovation projects
The number of renovation projects, the complexity of the renovation will obviously affect the length of the duration. There are many factors that affect the number of renovation projects, such as the condition of the house before renovation, decoration style, decoration budget and so on. In general, second-hand housing may be longer than the rough housing period, because the second-hand housing also has a demolition job. In addition, such as the simple style of the house decoration is generally more simple than the Mediterranean, European style decoration.
A subtitle |
Second, about 100 square home renovation period
The development of the renovation period requires the owner to negotiate with the decoration company. Although there is not a very specific time period, due to the fact that many people nowadays use relatively simple decoration styles, decoration projects are also common, so it is 100 squares and 2 bedrooms. For example, the renovation period is generally not too different from the following arrangements.
1. Structure Dismantling: 1-2 days
Before the house decoration, the structure is generally demolition and reform according to the design scheme. The houses of small and medium-sized houses generally take 1-2 days. If your family does not have this item, you can subtract this time.
2, hydropower reform: 5-10 days
The hydropower transformation is the slotting, wiring, acceptance, etc., depending on the complexity of the project, generally takes 5-10 hours, sometimes even longer.
3, mud tile project: about 10 days
The tile project includes items such as kitchen and toilets, waterproofing, ceramic tiles, and the like, and the time required varies depending on the area of ​​the tiles to be tiled. Usually about 10 days, if the waterproof does not pass the acceptance, the time may be longer.
Decoration construction knowledge
The made-in-China F Series mud pumps can meet the requirements of the same manufacturing technique and quality level as those of F series mud pumps of LTV Co. They feature advanced structural design, reliable use, easy maintenance and compact occupied area. Now, F series mud pumps (from F-500 to F-1600) have been produced in batches and sold to many abroad oilfields. Your order for F series mud pumps is cordially welcome.
The company provides various centrifugal pumps, chemical pumps, screw pumps, booster pumps, variable frequency constant pressure pumps, hydrochloric acid pumps, testing pumps, etc.
Mud Pump,Water Pumps,Booster Pumps,Solar Booster Pump
Rugao Yaou Import & Export Trade Co., Ltd , https://www.ntyaous.com